Friday, January 6, 2017

Hanna Log 06 Jan 17 Bilge Cleanup

06 Jan 17:

Wiped down the bilge of the Penobscot 17 "Hanna" today, and made some notes for upgrades. The limber (drain) holes need to be opened up a bit. The opening into the bulkhead could also be opened up a bit to provide better access. And the front face of the bulkhead is closed, that could be opened up as well for ventilation and access, the panel would still provide the necessary structural support. The floorboards may be redone with rot resistant cypress and a hole cut to provide easier access to the drain plugs.






Click Here for Hanna's page.

No comments:

Post a Comment