21 Jan 18:
We have a lot of new parts on the Dabber, so we thought we'd take them over to Capn Jack so he could inspect them. I planned to grab the bumpkin and bowsprit and Skipper said "Why don't we take the whole boat!." Hooked VICTORY up to BLUEBELL and headed across the bridge.
We rigged the boat minus the bumpkin, worked on that later. I've been told that the gaff halyard and jib halyard run through the holes in the mast thwart, so here that is.
Skipper and Capn Jack supervised.
Tied things down, this is how we'd hit the road.
https://www.youtube.com/watch?v=yt7CKOzhxG0&t=7s
VICTORY passed mid restoration inspection and we were cleared to continue. Once we were home we cut the opening for the mizzen mast. I leveleled the boat port to starboard, then started a small cut but cut too far forward and to starboard. I ended up cutting a shim out of teak to finish out the hole. Epoxied the shim into place using Pettit Flexpoxy.
Restoration Log for VICTORY.
No comments:
Post a Comment