18 May 22:
Second half of the trailer turning basin poured, noe I just have to keep Skipper off of it til it cures.
The Alcort Alcove got a piece of pegboard today, we'll hang the plethora of vintage Alcort parts on the board.
16 May 22:
Work began on the driveway expansion, aka boat trailer turning basin. This will be the flat, solid surface where trailers are connected and disconnected for mess about adventures. Also the wash rack. But first I should note that Curtis and his crew should not leave the keys in their equipment during lunch breaks while the little Pirate Skipper is around.