09 May 16: Station 2 frames finished. They were beveled on the inside face as well so that the seat riser fits flat.
Washed, vacuumed, 13 new frames, a new aft seat, repaired aft bulkhead, repaired transom, scarfed new piece into port seat riser, sanded entire hull, repaired crossmembers, new bow stem, plugged a lot of square nail holes, grafted in new bottom planks, pulled in some planks, new port sheer clamp, grafted starboard sheer clamp, started 1st coat of paint. All she needs now is caulk
Scarfs came out great.
Love the curves on this boat.
We are ready to do final adjustments on the sheer clamp/gunwale.
FMI: "Barabshela" a Rowboat of Captain Thomas Leathers' Design for Ms. Winnie Davis
No comments:
Post a Comment