Sunday, December 9, 2018

Alcort Super Sailfish ZSA ZSA 09 Dec 18 Toe Rail

09 Dec 18:

Bought some pine window trim at Lowes to be used as toe rails and rub rails. I was going to drive way out to the mill for a piece of cypress and then spend the rest of the day trying to rip a really long piece, Skipper suggested checking the pre made trim at Lowes. We found pieces that are very close to what came off, our adaptation will have the toe rail lap over the rub rail, all sealed up with epoxy. These rails will cover the deck edge seam and protect it, an improvement on the previous design that left the seam exposed.

The toe rails will need to take some edge bend up at the bow, so we are using the trailer and 2 days of rain to pre bend them.


Log of ZSA ZSA.

No comments:

Post a Comment