Saturday, January 30, 2021

1963 Alcort Sunfish CHIP 29 Jan 21 Floorboard

 29 Jan 21:

One of CHIP's floorboards went missing in Hurricane Sally surge, the other floated 300 feet up to the Carriage House, so we cut a new floorboard out of 1/4 inch marine grade plywood.



There is a small wooden cleat on the bottom that helps keep the floorboard from moving around. A note about floorboards, they can float away after a capsize, so dummy cords might be a good addition. 



The cleats are cypress, fastened with #8 x 1 inch silicone bronze Frearson Head screws, piloted and countersunk with combination Fuller bits. Bits and screws available from Jamestown Distributors.


Used Skipper's ratcheting bit brace and auger bits to drill the finger holes, the bit brace was her Grandpa Nelson's.


Both floorboards got a coating of TotalBoat WetEdge BlueGlo White with a Redtree Fooler double bristle Brush (also available from JD). During Sea Trials I found that the coating is slippery, so we will apply a coat to TotalTread once the base coat dries


Log of CHIP.

No comments:

Post a Comment